Image Gallery

Field, Forest and Shore …

Our Urban Landscape

The Old Cottage Tradition

Development Plans and Proposals

 

 

Recent Posts

Commercial at the Core

A new building under construction on the south side of Innisfil Beach Road is the first development to follow the design guidelines set out under the Inspiring Innisfil 2020 Official Plan. It is a multi-story, mixed-use building that fronts the sidewalk.

IBR02

The original signage on the property indicated it would be a medical building. The current signage only indicates leasing availability. It remains to be seen what final form this development will take and whether it is the start of a new approach to Alcona development or whether it will be an anomaly on the street.

Meanwhile, the development proposal for the Abendel property on the north side of Innisfil Beach Road seems to have stalled or collapsed. Old signage has been left to deteriorate. Nothing further has occurred since the additional purchase of Scotty’s Towing, which is boarded up. This was originally proposed to be yet another strip mall with the addition of a bank building and a fast-food franchise. Local resident opposition blocked earlier proposals for a residential tower and townhouses on part of the property.

Over at the 25th Sideroad and Innisfil Beach Road, the corner property has also been idle for the summer in spite of reported OMB approval for a proposed multi-story seniors condo with ground-floor retail and a banner proclaiming, “great things are happening”.

After the departure of Lakeside Treasures this summer, 1041 Innisfil Beach Road also sits idle. This property has a history of frequent tenant turnover. A rezoning notice appeared briefly this summer for a “one story commercial” building before being taken down.

At the western end of Alcona, a new housing tract is advancing toward the northern edge of the No Frills parking lot and a new building is taking shape near the supermarket, expected to be another fast-food franchise.

The Centreville plan in Stroud is advancing. Land severance has been approved for single detached housing on the north side of the property. Townhouses, a gas station, convenience store and strip mall form the rest of the project.  A ‘hold’ designation remains on actual construction until final design plans are approved.

In late 2011, the Retail Demand Study found that 2/3 of all resident expenditures were made outside of Innisfil. It suggested that with further residential growth, it would present an “expenditure potential” of over $400 million by 2021. More than 5 years later, it appears that potential for local shopping will be difficult to realize for many more years to come. For the uninitiated, it’s difficult to understand what hurdles are preventing an obvious opportunity from being realized.

  1. Passive Design, Active Results Comments Off on Passive Design, Active Results
  2. Celebrate and Contemplate Comments Off on Celebrate and Contemplate
  3. Climate Change Survival Comments Off on Climate Change Survival
  4. A Few Centuries, and 150 Years Comments Off on A Few Centuries, and 150 Years
  5. Stroud Centreville Gets Another Look 1 Reply